PARTNERS

Unlock transit data across your agency and beyond

Swiftly provides reliable data that staff, partners, and riders can trust—integrated across critical transit software and hardware platforms. Get more from your agency’s existing tools and technology investments.
Request a demo
Logos of technology partners including Rideco, Lyt, Iris, Giro, Miovision, and a location pin icon, over a map background.
Decorative background graphic showing an abstract road network pattern.

Trusted by 200+ transit agencies worldwide

Akron METRO logo
ART Arlington Transit logo
CapMetro logo
Durham Region Transit logo
EMT Madrid logo
LA Metro logo
MBTA logo
MDOT MTA logo
Metro Trains Melbourne logo
Miami-Dade Transit logo
New Jersey Transit logo
Pierce Transit logo
RTA Dubai logo
RTC of Southern Nevada logo
SEPTA logo
TheBus logo
Valley Metro logo
WMATA logo
CASE STUDIES

Powering the cities that move the world

Transit agencies of all sizes rely on Swiftly’s Transit Data Platform to improve the rider experience, boost service reliability, and operate more efficiently.
LA Metro
Having these standards and APIs makes all of this communication to riders possible. No matter which platform riders choose, we as an agency just have to publish that once.
Nina Kin
,
Digital Experience Tech Lead
Learn more
Jarrett Walker + Associates
Swiftly provided detailed speed data for existing routes, allowing us insights into better drive time assumptions in the planning process for Miami's Better Bus Network.
Scudder Wagg
,
Principal Associate
Learn more
Miami-Dade Transit

Reliable data informs historic network redesign

Miami-Dade Transit and Jarett Walker + Associates relied on Swiftly data to inform their Better Bus Network redesign, giving the average resident access to 28% more jobs and useful destinations.
30%
More access to frequent transit
3.5%
System-wide OTP improvement
10%
Improvement on priority routes
Learn more
See all agency case studies
Mobile trip-planning applications

Best-in-class passenger information, available everywhere

Meet riders where they are by providing the industry’s most accurate real-time information directly in leading trip-planning apps. Swiftly’s disruption-aware predictions take into account detours, cancellations, skipped stops, and more, banishing ghost buses.
Animated illustration of a detour being drawn on a digital transit map, with a 'Detour in effect' notification.
Google Maps logo
Transit logo
Apple Maps logo
Moovit logo
Actionfigure logo
Scheduling and daily operations software

Build better schedules using real-world data

See real-world historical data directly in the scheduling tools teams already use. Swiftly integrates with Hastus, Remix, and Optibus—so every timetable is built on the patterns of how service actually operates.
Screenshot of Swiftly's real-time schedule dashboard for route 44 (University-Cumberland to Park-30th), showing scheduled run times and a table of trip patterns with observed travel times.
Remix logo
Optibus logo
GIRO logo
Actionfigure logo
CSCHED logo
Planning consultants

Actionable insights for planning projects

Access historical data on run-times, on-time performance, service completion, segment speeds, and ridership for a holistic picture of system performance. Intuitive dashboards and flexible APIs help surface insights for network redesigns and infrastructure planning.
Screenshot of a transit map showing a bus stop's average daily boardings alongside a route ridership panel.
Jarrett Walker + Associates logo
Nelson\Nygaard logo
TYLin logo
Kimley-Horn logo
WSP logo
TMD logo
Foursquare ITP logo
Transit signal priority (TSP)

Power cloud TSP without new hardware

Swiftly partners with leading TSP providers to power cloud TSP with our best-in-class vehicle location data—using your existing onboard technology, no new hardware required.
LYT logo
Miovision logo
Kimley-Horn logo
ThruGreen logo
EMTRAC logo
Applied Information logo
Econolite logo
Onboard systems

Reliable data for onboard systems

Swiftly supports industry-leading AVAS, headsign, and APC providers through a standards-based approach to onboard systems. Benefit from flexible hardware procurement while building rider confidence.
Diagram showing data-type icons arranged in a circle around a bus icon, illustrating Swiftly's CAD/AVL features.
iris logo
INFODEV logo
Xovis logo
WaySine logo
MessagePoint Media logo
Cradlepoint logo
Maestronic logo
Hanover logo
Luminator logo
Enterprise GPS data

The best data on where a bus was, is, and will be

Swiftly is the only platform to integrate multiple GPS sources: fleet telematics, WiFi routers, CAD/AVL, and more. Combining data sources increases GPS reporting rates by 80% for more precise real-time and historic data, as well as making systems resilient to outages.
Illustration of a transit route map with a location pin and checkmark icon, representing Swiftly's enterprise GPS vehicle tracking.
Samsara logo
Motive logo
Cradlepoint logo
Digi logo
Teltonika logo
Peplink logo
Cisco logo